Better, Faster, Stronger — It’s The Bionic House!
Posted on September 6, 2007 by Joyce Benson
Tag(s): Green Building
While not exactly bionic, the first ever factory-built green home in Colorado is one of high performance. The pre-fab construction process, by Eco-Infill, yields significantly less construction waste, is more energy efficient, ensures a steady labor force, and can be built in a shorter time frame.
This cool, modern home aims to achieve the U.S. Green Building Council’s LEED silver certification, incorporating more sustainable practices that consider: energy performance, water efficiency, indoor environmental quality, sustainable materials and resources, site protection, and size and location.
Comments
Comment on this post